A weekly report builds itself when the data reaches it without a person. Excel's Power Query feature merges the weekly exports without a programmer, provided they land in a dedicated folder with identical columns, and one refresh gives you the report. For many small firms that is enough. The limit is where someone has to download the export by hand every week: if that does not happen, the week is missing from the report. Replacing the download takes a machine connection to the source and a check that stops the send when data is missing or wrong.

What does Excel do without a separate program?

Power Query combines files with the same structure into a single table. It is available in Excel 2016 or later Windows stand-alone versions and in the desktop Excel app of Microsoft 365 plans. The Microsoft 365 Business Basic plan has no desktop Excel, and Excel for the web does not read a local folder. According to Microsoft, every file needs the same column headers, data types and number of columns, and the folder must hold no other files. The columns may come in a different order, because Power Query matches them by name.

The report sits on a separate worksheet built on this table. On the Usage tab of the Connection Properties dialog box you can select the “Refresh data when opening the file” check box, or enter how many minutes should pass between refreshes. Ctrl+Alt+F5 refreshes the whole workbook.

The export, however, does not get there by itself: Power Query reads what is in the folder. With refresh on open or at set minutes you cannot time the report for Monday morning; scheduled refresh is offered, for example, by Power BI. So in this setup someone opens the file on Monday, checks it and sends it.

How is the report built from a NAV Online Számla export?

Illustrative example: by Monday morning you need last week's outgoing invoice turnover. The source is NAV Online Számla, the Hungarian tax authority's invoice data system, because you can try this export today. For a management report or any other recurring statement, the same steps follow one another; only the source differs.

  1. Download. Your colleague logs in to the Online Számla interface, filters the outgoing invoices to last week, and exports them with the Teljes lista-export (full list export) button, choosing Csak számlafejlécadatok (header data only). The Kijelöltek exportja (selected-invoices export) button gives one file per invoice in a zip, which does not work for the weekly merge. According to NAV's manual, an .xlsx holds at most 1,200 invoices or 15,000 line items and a .csv at most 6,000 invoices or 60,000 line items, and the finished file can be downloaded for 24 hours. If your colleague is on leave, or the 24 hours pass, no new file reaches the folder, and the report is built from old data.
  2. Folder. The file goes into a folder used only for this, with no other files next to it.
  3. Merge. In Excel you read this folder (Data > Get Data > From File > From Folder). Leave the Skip files with errors check box clear: if it is selected, the bad file drops out of the result, so a whole week can be missing from the total.
  4. Dates and amounts. Power Query interprets values by the computer's regional settings. If the file uses another format, dates that cannot be read produce errors, but others can load with no error and the day and month swapped. Right-click the column heading and set the type with a locale (Change type > Using locale). As a check, split the day, month and year into separate columns. For a long CSV, base data type detection on the entire data set instead of the first 200 rows.
  5. Statement. The weekly report template in this example has three worksheets.
    • Data: the Power Query result; you do not touch it by hand.
    • Report: the number and net value of last week's outgoing invoices, in forints.
    • Check: the number of rows and files loaded, the number of empty amount and date cells and the date of the newest file.
  6. Sending. On Monday your colleague opens the file and sends the report only if the numbers on the Check sheet are right.

Many small firms can stop here: the manual step stays, but an error comes to light before the report goes out.

Where does the report stall when you download the data by hand?

The weak point is the manual export: a person downloads it, a person puts it in the folder, and a person can overwrite the file. Microsoft's documentation distinguishes two kinds of error. If someone renames a column heading in the first file, which Power Query uses as the sample, or the folder itself moves, the query stops with an error, the worksheet keeps the old numbers, and the yellow pane appears in the Power Query Editor. In Microsoft's own example, a manually changed heading is the cause. If a cell holds a bad value, the load completes, the worksheet cell stays empty (Error shows only in the Power Query Editor), the total drops, and nothing in the report shows it. If the heading changes in another week's file, that column can come through empty for that week with no error, and if a file leaves the folder, that week drops out with no error message. You notice the stop at once; the rest only on the Check sheet, so check the file count and the empty amount and date cells there as well as the row count and the newest file date.

What should you do if the export stays manual?

Follow four rules:

  1. The export always goes into the same folder, with no other files next to it.
  2. Have a stand-in for the download. Without one, the report does not get built during a holiday.
  3. Do not select the Skip files with errors check box.
  4. Only the person who has looked at the Check sheet sends the report. In the Power Query Editor you can see the rows with errors even if you do not fix them.

For the next four Mondays, write down who downloaded the data, how long it took and where the report stalled. From the weekly time and your colleague's hourly wage you can work out what this step costs today. By the end of the month you will also know whether the trouble comes from the download or from the data.

If your weekly report stalls at the manual download, we go through the process step by step and tell you which step is worth handing to a machine. Business process automation

Can Power Automate or Power BI schedule the refresh?

A Power Automate scheduled flow can send the report by e-mail every week; Microsoft gives this very example. But you cannot leave the refresh to it. According to Microsoft's troubleshooting guide, an Office Script run from a flow cannot refresh most data: the refresh commands do nothing and raise no error. The flow shows a successful run, and last week's numbers stay in the report.

Do not build on Excel started on a schedule with nobody watching. Microsoft does not recommend and does not support unattended automation of Office applications, because Office may behave unstably or deadlock in that environment. On Microsoft's forum a moderator suggested Power Automate Desktop, which opens the workbook, refreshes it, saves it and closes it. With nobody sitting next to it, it needs a Process license or pay-as-you-go billing, and a user with a Power Automate Premium license as well: a Process license can be allocated only to a machine registered by such a user. We cover when Copilot is enough in Microsoft 365 and when you need Power Automate in a separate article.

Power BI can schedule the refresh, up to eight times a day on the Pro level. Microsoft does not promise an exact minute: a start within 15 minutes is the target, but if resources are not free, the refresh can run up to an hour late. After four consecutive failures or expired credentials the schedule is switched off, and it also pauses if nobody views the report for two months. A manual file can stop the refresh here too: if you overwrite the source on OneDrive by copying, the refresh breaks, so replace the file by uploading it.

What does each option cover?

OptionRuns by itselfStays manualWhat it takes
Excel and Power Query, with a manual exportMerging the files, refresh on openThe export, opening, checking and sendingExcel 2016 or later on Windows, or desktop Excel from Microsoft 365
A scheduled flow for the finished fileThe weekly e-mailThe export and the refreshA work Microsoft account
Power BIThe scheduled refresh and the weekly e-mailReplacing the source file, if it works from a fileTo send to others, a paid Pro or PPU license. Pro is EUR 12.10 net per user per month, billed annually (list price, November 2026). For a file on a local network, an on-premises data gateway
A machine connection to the sourceThe download as wellMaintaining the script, handling errorsA technical user or other machine access, a script, and someone who maintains it

What replaces the manual export?

A script that requests the data directly from the source, over a machine connection (an API). For invoice data, this is what the NAV Online Számla interface is for: based on search criteria it returns a digest of the invoices, which can include the net amount in forints and the payment due date (neither field is mandatory, and a simplified invoice's summary holds only gross amounts). One query spans at most 35 days. For this you need a technical user, and the primary user is the only one who can create it.

NAV provides invoice data only: bank, stock and webshop data come from elsewhere. For these, ask the provider whether it offers an API. Where there is no machine connection, a robot can click through the download.

Both routes need someone to maintain the script or the robot, and the script must also stop the send when data is missing. This is development work. We have no published case on a weekly report, but we do on invoice processing: a system we built for a freight company brought supplier invoice processing down to 4 hours from 3 days, and 85% of invoices now pass through with no human intervention.

What should you do with your own weekly report?

  • You work from one or two exports, and someone checks them on Monday. Stay with Excel and the steps above. If the download caused no trouble during the four weeks, you need neither a developer nor us. If the decision is not yours, take your notes to the managing director: they show whether development is worth paying for.
  • Columns changed or rows went missing. Sort out the data first: ask the program's vendor for a consistent export, because until then no option gives a reliable report.
  • Several people expect the management report, and the licenses fit your budget. Schedule it in Power BI, leave the refresh failure e-mail switched on, and do not promise an exact arrival time.
  • The report stalls at the download, and the source has a machine connection. It is worth replacing the manual step with development and building in the check. Our business process automation page describes how we go through this step by step. Tell us which report takes the most manual work, and we will write back which step is worth handing to a machine.
  • Your weekly data comes from documents arriving in a mailbox or a folder, and an Excel or CSV file at the end is enough. Our fixed-price work covers one process and ends in a file. The smallest version is one input and at most three layouts; a second input or more layouts can be included, at a higher price. Your weekly report fits if the result is a file and its source is documents arriving in a mailbox or folder. Describe the task and we will tell you whether it fits.
  • You would expect the numbers from AI. A fixed-format report needs no language model: the numbers come from a query or a formula. If the download has to be replaced by clicks, that is a job for RPA; our article on the line between RPA and AI gives a similar example.
  • Nobody makes a decision from the report. End it, and do not spend money on it.